Projects

I-45 Project

road construction

Location:

The Woodlands, TX

Expertise:

Construction, Environment

Services:

Roadway Design, Traffic Engineering

WSB is making ramp improvements on I-45. Previously WSB conducted a feasibility study for the ramp improvements along I-45 between Hardy Toll Road and Woodlands Parkway. Traffic data collection, operational analysis, and safety analysis were evaluated in the study. The I-45 consists of 3 consecutive multi-level interchanges which inevitably produce a major congestion of traffic. The $180 million dollar project will include the design and construction of collector-distributor roadways and braided ramps which will ease the flow of traffic. WSB will administer schematic design, environmental assessment, traffic analysis, Interstate Access Justification Request (IAJR), and final design.

People working at a table.

Discover Our Difference

We partner with our clients and communities to build what’s next in infrastructure – the places, spaces, and systems that support our lives.