WSB Engineering Logo About usservicesclient zoneour worknews & mediacareers
Contact WSB

Boeing Crane Structural Analysis, Monticello

WSB teamed with GCI-Engineered Solution to perform a variety of services to complete the structural analysis for the new Boeing 787 Dreamliners. WSB performed a structural analysis of the lifting system that will be used to assemble the new Boeing 787 Dreamliner. The structural work included a detailed seismic analysis meeting the requirements of the International Building Code. A load test on the system confirmed the predicted deflection to a high degree of accuracy.

Client: The Boeing Company
Completion: March 2007