WSB & Associates, Inc.

About usservicesour workclient zonenews & mediacareers

 

Regional Storm Water Treatment System

Brooklyn Center, MN

This project included preparation of a feasibility report to explore options available to provide storm water treatment to the TIF District 3 Area in Brooklyn Center. Storm sewers servicing the neighborhood discharged directly to the Mississippi River, with little or no storm water treatment. A traditional pond was not a feasible option due to limited public right of way or available land that

would be suitable for construction of a pond. Several options were evaluated in the feasibility study and a recommendation was made to construct a large, underground treatment system on the 72 inch diameter trunk storm sewer line that would treat a 493-acre drainage area.

WSB designed the 52 foot wide by 64 foot long underground system to retain 80 percent of the total suspended solids flowing through the trunk storm sewer for the one inch, 24 hour rainfall event. It was also designed to retain floatable pollutants entering the device. The structure was appropriately sized to make sure that resuspension of retained materials would not occur for rainfall events up to, and including, the ten year, 24 hour event. This resulted in the design of a bypass manhole that allows large rainfall events to bypass the system. To facilitate a demanding construction schedule and to increase the ease of installation, WSB worked with the manufacturer of the device to implement a precast design for the structure’s walls.

WSB completed plan and specifications for the City project and worked with West Mississippi Watershed Management Commission to determine the extent that this project could be used to meet the Watershed’s requirements for future development in the City.

WSB also provided topographic and construction surveying, construction observation, and construction engineering services throughout the project. It is currently in operation.

Project Awards:

  • 2009 ACEC/MN Engineering Excellence Honor Award
  • 2009 MSPE Merit Award
  • 2008 CEAM Municipal Project of the Year - Honorable Mention

Client: City of Brooklyn Center
Completion: 2007

[back]